Riverside Hydronics Centauri 2000 WB 250A-IFC Guía para resolver problemas Pagina 2

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 1
2
34-52 07/13
TABLE OF CONTENTS
1. Safety Considerations
2. Standard Features and Equipment
2.1. Performance
2.2. Burner, Combustion Controls & Operating Controls
2.3. Remote/Network BAS Interface
2.4. Warranty and Service Policy
3. Product Description
4. Boiler Installation
4.1. Checking Equipment Before You Install
4.2. Codes
4.3. Electrical Requirements
4.4. Location
4.5. Service Clearances
4.6. Clearances to Combustible Surfaces
5. General Piping Guidelines
5.1. Inlet and Outlet Connections
5.2. Supply and Return Piping
5.3. Condensate Drain & Disposal
5.4. Condensate Neutralization System (optional)
5.5. Temperature Control Sensor (Install in system return piping)
5.6. Filling the Boiler
6. Gas Supply Piping
6.1. Inlet Gas Pressure
6.2. Manifold Gas Pressure
6.3. Gas piping Size
6.4. Appliance Isolation during Gas Supply Piping Pressure Test
6.5. Gas Connection
6.6. Gas Train and Controls Certification
6.7. Gas Control Trains
7. Combustion and Ventilation Air
7.1. Equipment Located In Confined Spaces
7.2. Maximum Allowed Remote Combustion Air Inlet Length (Equivalent Length)
7.3. Remote Combustion Air Cap
7.4. Vertical or Horizontal Remote Air Duct Termination
7.5. Remote Air Consideration for Combined Remote Air Ducting
8. Venting
8.1. Venting Options
8.2. Category IV
8.3. Maximum Category IV Vent Length (Equivalent length)
8.4. Vertical or Horizontal Vent Termination
8.5 Combining Category IV Vents
Vista de pagina 1
1 2 3 4 5 6 7 ... 39 40

Comentarios a estos manuales

Sin comentarios